Specific Repair Plan
CMI Specific Repair Plan (SRP) is designed to assist our clients with
the assessment and prioritization for the implementation of necessary
repairs or improvements of existing developments. Our goal is to
develop and execute a plan that will respond to the immediate and long
term repair needs of the building, as well as minimize, as much as
possible, the impact of the individual homeowner, tenant or users of
the structure. The plan focuses on required, recommended and optimal
repairs, alternative materials and methods, and also takes into
consideration budgetary constraints.
The process begins by meeting with the client to establish the project
requirements. Further investigation includes conducting field surveys,
performing appropriate testing, assembling and evaluating all available
information including: original construction documents, maintenance
records, client-based surveys, etc. Once the investigation and research
is complete, CMI will provide a working document to assist the client
in understanding the problems associated with the structure, the
required repairs and schedule to remedy the problems, and the
associated potential costs. The goal is to give the client all
information necessary to make an educated decision, which will
ultimately lead to fixing the problems. The final approved SRP will be
the basis of construction documents to be used for the actual
construction.